The concrete is still curing, so I can’t get any photos of it yet. But the basement slab is now poured. It won’t be polished like the main floor slab, as we’ll be putting carpet down for the basement (to the great consternation of our heating & cooling design dude).
The engineers kept pushing for the thermodynamic and design simplicity of a concrete floor in the basement, and I kept pushing back. The basement will eventually house the theater and Lego room. It needs to be cozy, not commercial. I guess we could always polish it later if we wanted.
“The man.” Indeed.